Biohacker Ingredient Intelligence
Freeze-dried yield and cost calculator
Estimate finished mass, feed-to-output ratio and production cost from your own solids, moisture and cost assumptions.
Free tool. No sign-up. Calculations stay on your device.
Your scenario. Verify every assumption with measurements or documentation.
Your inputs
Selecting a fruit does not fill in solids, costs or process suitability.
Estimated results
Enter valid mass, solids, retention and moisture to see the mass balance.
- Physical inputs include assumptions, not verified measurements.
Engineering estimate only. Not a quotation, guaranteed yield, process validation, COA or safety assessment. Factory-cost scenario, not landed cost.
Excludes costs not entered: freight, insurance, duties, taxes, QA, certifications, energy, financing, spoilage and selling expenses. Requires a separate commercial and technical review.
yield-mass-balance/v1.0
Discuss the next step
Optional and unchecked by default. Context uses this tab's storage for up to 30 minutes, then is removed on transfer. No calculations in URLs, advertising pixels, backup forms, Supabase or WhatsApp. Only your final RFQ submission sends the selected attachment through the existing email provider.
A development inquiry is not a purchase commitment. Processing availability and feasibility are reviewed separately; Brazil-specific services are not assumed available internationally.
Methodology and units
Mass balance
All percentages are wet-basis mass fractions, divided by 100 once. The model tracks retained dry solids, then adds the specified residual water.
M₀: prepared feed (kg); s: total solids fraction; r: dry-solids retention; u: final moisture fraction; Mƒ: finished mass (kg).
S₀ = M₀ × s
Sᵣ = S₀ × r
Mƒ = Sᵣ ÷ (1 − u)
Finished yield: 100 × Mƒ ÷ M₀
Feed-to-finished ratio: M₀ ÷ Mƒ
Residual water in finished product: Mƒ × u
When solids are lost, the difference between initial and final mass is not all sublimated water. This tool does not estimate vapor load, energy or drying time.
Production cost assumptions
Batch cost = feed × raw cost + charged mass × processing fee + finished mass × packaging + fixed overhead. Unit cost = batch cost ÷ finished mass.
No exchange rates or currency conversion. Changing currency clears all prices and costs.
Excludes costs not entered: freight, insurance, duties, taxes, QA, certifications, energy, financing, spoilage and selling expenses. Requires a separate commercial and technical review.
High-sugar or high-oil materials and carrier-containing formulations need product-specific process evaluation. This mass balance cannot establish freeze-drying suitability or shelf life.
Method references
References explain drying and its limitations; they do not certify the input data, costs or this scenario.
Questions about the calculator
Can I use °Brix as total solids?
No. °Brix is not a general measurement of total dry solids. Obtain a suitable total-solids measurement or documented specification for the prepared feed.
Is 95% retention a standard yield?
No. It is only an illustrative assumption for retained dry solids. Preparation losses and process-specific solids losses need separate evidence.
Why is there no unit cost?
Unknown costs are not treated as zero. Enter each cost, including zero when justified, or explicitly mark it as not applicable. A valid mass balance can still be calculated without prices.
Are these Biohacker supplier prices?
No. All prices are entered by you or loaded as a clearly labeled example. Availability, MOQ, specifications, lead time and pricing require a separate RFQ review.
Does a low final moisture prove safety?
No. Moisture is not water activity. A mathematical mass balance does not validate microbiology, shelf life, packaging, process suitability or regulatory compliance.
Will my calculations be sent to Biohacker?
Not automatically. Calculations run locally. You can separately authorize technical context and economic assumptions before opening the existing RFQ, review the attachment there and submit it yourself.
Explore related ingredients and formats
Product specifications and supply conditions are assessed per project, not inferred from this calculator.
